Call: 01642 913727
Monday-Saturday: 9am - 5pm
Call : 01642 913727 Monday-Saturday: 9am - 5pm
Close My Cart 0
Sub Total 0 £0.00
Close My Cart 0
Sub Total 0 £0.00
Menu

How To Install A PVC Ceiling

18 Jun 2019, 1:53 PM
How To Install A PVC Ceiling

Installing a PVC ceiling in a bathroom or kitchen is a cost-effective and visually appealing way to enhance the aesthetics of your room. PVC ceilings are durable, low-maintenance, and highly customizable. Also see our post which details the Reasons To Install A PVC Ceiling.

But how do you install PVC ceiling cladding? Whether you're a DIY enthusiast or a homeowner looking to renovate, this step-by-step guide will help you successfully install a PVC ceiling.

Tools and Materials You'll Need

Before you begin, gather the following tools and materials:

  1. PVC Ceiling Panels: Measure your ceiling area to determine the number of panels needed.
  2. Trims: optional perimeter trims and joining trims
  3. Adhesive: Use a high-quality PVC adhesive that bonds well with PVC and the backing ceiling material ie painted plaster.
  4. Measuring Tape: Essential for accurate measurements.
  5. Pencil or Pen: to mark out cuts and scribe joints.
  6. Level: Ensures that your installation is straight and even.
  7. Saw: To cut PVC panels to the required size.
  8. Stanley Knife: for smaller neat cuts
  9. Nails or Screws: For securing panels to the ceiling.
  10. Screwdriver or Nail Gun: Depending on your choice of fasteners.
  11. Ladder, hopup or Scaffold: To reach higher ceiling areas safely.
  12. Safety Gear: Including safety glasses, gloves, and a dust mask.

The video below is a demonstration outlining just one method for fitting ceiling panels. Although this video was produced in Australia the process is the same or similar.

 

In the video above you will see the use of a perimeter trim. For the best results and easier installation the use of a 2 part trim. Here’s your step by step guide to fitting ceiling cladding.

Step 1: Prepare Your Workspace

1.1. Clear the room of any furniture or obstacles to create a safe and spacious work environment.
1.2. Turn off the electricity to the rooms lighting if you need to remove light fixtures to avoid any electrical hazards.
1.3. Ensure the ceiling surface is clean, dry, and free from any dust or debris.

Step 2: Measure and Mark

2.1. Measure the dimensions of your ceiling to determine the number of panels you'll need and the optional trims
2.2. Mark the centre of the ceiling using a chalk line or a pencil.

Step 3: Cutting the Panels & Trims

3.1. If you are using the optional start finish trims (if not skip to 3.3), measure the ceiling perimeter walls and cut the back section of the 2 part start-finish trim to length.
3.2. Fix the back section of the start-finish trim to the perimeter of the ceiling using screws approx. 300mm apart.
3.3. Measure and mark the PVC panels according to your ceiling dimensions.
3.4. Use a hand saw or power chop saw, cut the panels to the required size. Ensure clean and straight cuts.

Step 4: Apply Adhesive

4.1. Apply a generous amount of the PVC adhesive evenly to the back of the first panel.
4.2. Position the panel on the ceiling, aligning it with the centre mark or along a starting wall. Ensure not to leave an awkward cut for the final panel.
4.3. Press the panel firmly to ensure proper adhesion.
4.4. Secure into place on the ceiling with screws or nails every 300mm along the grove section of the panel. These can easily be secured to plasterboard or plastered ceiling without the need for drilling or wall plugs. These fixing will be covered by the tongue section of the next panel

Step 5: Continue Installation

5.1. Repeat steps 4.1 to 4.4 for the remaining panels, working from the first panel affixed.
5.2. Use a level to ensure that each panel is installed straight and flush with adjacent panels.

Step 6: Trim and Finish

6.1. If you are using start finish trim, remeasure the perimeter of the ceiling and cut and mitre the outer second part of the start-finish trim.
6.2. Click the finish trim into place.
6.3. If you have decided to not use the start finish trims, the ceiling edge can be finished with a neat seal of silicone sealant.

Step 7: Clean Up

7.1. Clean any adhesive residue or dust from the PVC ceiling.
7.2. Return furniture and fixtures to the room.

Step 8: Enjoy Your PVC Ceiling

Your PVC ceiling is now installed and ready to enhance the beauty of your room. PVC ceilings are not only visually appealing but also easy to maintain and clean. They are resistant to moisture, making them an excellent choice for kitchens and bathrooms. Enjoy the benefits of your newly installed PVC ceiling for years to come. Also see our post which details the Reasons To Install A PVC Ceiling.

 

 

Remember that safety should always be a priority when working with tools. Follow manufacturer guidelines for the specific PVC panels and adhesive you choose, as they may have unique recommendations. If you're unsure about any step of the installation process, consider consulting a professional for assistance.

We hope you find this information and instruction helpful. View our range of Plastic Ceiling Cladding here. At Rubberduck Bathrooms we offer a wide range of ceiling cladding which is available to purchase.

This guide was created for reference only. www.rubberduckbathrooms.co.uk can not be held responsible for injury or damage caused if you decide to use this method.

Thank you for subscribing to the
Rubberduckbathrooms newsletter!